期刊文献+

高河煤矿水体下“综采放顶煤”开采可行性研究 被引量:1

Feasibility study of Gaohe coalmine top coal caving under Zhanghe river
在线阅读 下载PDF
导出
摘要 本文结合国内水体下采煤经验,在分析研究了潞安集团高河煤矿矿井充水因素、覆岩结构、导水裂隙带和计算防水安全煤岩柱等工作的基础上,对漳河下采用“分层综采”与采用“综采放顶煤”技术开采3”煤层可行性进行了评价,最终选定“综采放顶煤”一次采全厚。 The author evaluates the feasibility of the top coal caving technique of #3 coal seam under the fully mechanized slice mining technique and fully mechanized Zhanghe River on the base of domestic experiences of mining under water strata and analysis of coalmine water filling factors, overburden structures, water conducted fractured zones and water proof safety coal pillar calculation of Gaohe coalmine, Lu'an Group. The mining technique is finalized as top coal caving technique for the full seam mining.
出处 《陕西能源职业技术学院学报》 2009年第3期11-14,共4页
关键词 水体下采煤 导水裂隙带 分层综采 综采放顶煤 coal mining under water strata water conducted fractured zone fully mechanized slice mining techniqu fully mechanized top coal caving technique
  • 相关文献

同被引文献6

引证文献1

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部