摘要
A large-scale compressor set of a 2 kW helium cryoplant, as one of the subsystems of EAST (the experimental advanced superconducting tokamak), is arranged in a two-stage seriesparallel structure. A fully automatic control system used to handle the compressors' on/off/ scheduling and the pressures' adjustment was developed. To reduce the long time lag and the uncertainty with the energy slide valves effectively, expert rules in combination with proportional- integral-derivative (PID) algorithms were applied nisms were built up to reinforce its stability and to the EAST operations and is operated stably. system, such as the big overshoot of pressure and Safety protection and status analysis mecha- robustness. The new system has been applied The problems in the previous semi-automatic complexity of the operations, were solved.
A large-scale compressor set of a 2 kW helium cryoplant, as one of the subsystems of EAST (the experimental advanced superconducting tokamak), is arranged in a two-stage seriesparallel structure. A fully automatic control system used to handle the compressors' on/off/ scheduling and the pressures' adjustment was developed. To reduce the long time lag and the uncertainty with the energy slide valves effectively, expert rules in combination with proportional- integral-derivative (PID) algorithms were applied nisms were built up to reinforce its stability and to the EAST operations and is operated stably. system, such as the big overshoot of pressure and Safety protection and status analysis mecha- robustness. The new system has been applied The problems in the previous semi-automatic complexity of the operations, were solved.
基金
supported by National Meg-science Engineering Project of the Chinese Government,[1998]1303