长期以来,电力企业用户对数据中心的规划,一直把焦点简单的聚集在电力电子层面,即IT设备的容量和处理能力是否满足企业本身要求,场地和UPS电力供应的精度和延时是否能满足IT设备的容量要求,却甚少真正的从系统全面的角度去考虑规划建设一个高可用性数据中心需要注意的全部问题,基于以上事实,本文对数据中心的规划过程中UPS及机房冷却系统技术应注意的一些重要问题进行了详细的论述。
In the past days, when planning a new Computer Date Center, Some power enterprise user had been accustomed to focus on the power-electronic level, viz. if the capacity of IT equipment and the processing speed of Computer can meet enterprise' s requirements; if the UPS can output a high quality utility, etc. thereby seldom to consider all different parts of a date center as a total system, base on the above issues, this article give some highlight on UPS and cooling system' s application .when planning a Computer Date Center.