摘要
对黄岛电厂1~4号机组进行多次热力试验,由试验结果分析认为:125MW机组运行经济性较差,热效率和缸效率都低于设计值较多;原苏制215MW机组运行经济性稍好。此外,本文还分析了机组的耗能情况,提出降耗指标,以及对机组通流部分的节能改造,提高内效率可行性的论述。
It has been finished that performance test of #1-4 turbine generators for many times from 1995 to 1997.Based on the data of performance test,their operating performance has been analyzed.The 125 MW turbines suffer from relatively poor operating performance.Their thermal efficiency and cylinder efficiencies are lower than design data.The 215 MW turbines have a little better operating performance.And also,the paper analyze the condition of energy consumption,raise the target to reduce energy consumption,and the ability of improving thermal efficiency with the application of advanced energy saving retrofit technology.
出处
《山东电力技术》
1998年第5期37-40,共4页
Shandong Electric Power