针对传统的施工进度网络计划优化法所存在的各种弊端,提出一种以企业经济效益为目标,同时考虑工期、成本(费用)、资源3个指标,用双代号决策网络。
Because the network scheduling optimium technique of construction has some shortcomings,this paper put forword a comprehensive optimium method which take the economic benefit as our objective and meantime consider three indexes such as time limit for a project,cost and resource and use two-code name decision network to obtain the best economic benefit from whole interest.