小型水电站厂房主机间底板温控方案研究

Research on Temperature Control Scheme of Foundation Slab for Powerhouse of Small-scale Hydropower Plant
在线阅读 下载PDF
导出
摘要 利用数值仿真方法,对某小型水电站厂房主机间底板的结构分缝形式(包括一机一缝、两机一缝、三机一缝和三机一缝设后浇带等结构形式)、过水状态、不同基础类型、浇筑计划、底板混凝土的设计龄期等进行了系统研究,在小型水电站建设的特定情况下,对影响厂房间底板混凝土的最高温度和水平约束应力进行了影响因素分析,并根据建设实际,提出了相应的温控方案,该温控方案对小型水电站建设中的底板设计与施工具有一定的参考意义. By using numerical simulation, the systematic research is carried out about the following aspects of powerhouse as structural style, including a joint for a generating Unit, a joint for two units, a joint for 3 units, a joint for 3 units with post-constructed belt, whether to overflow, foundation type, construction plan, concrete designed-age, etc. ; under those specific circumstance of small-scale hydropower plant, the sensitivity is analyzed about peak temperature and maximum stress which have effects on the concrete of foundation slab. A temperature control scheme is given so as to offer for reference to other small hydropower plants in the future.
出处 《三峡大学学报(自然科学版)》 CAS 2009年第4期1-4,共4页 Journal of China Three Gorges University:Natural Sciences
关键词 小型水电站 底板 温度应力 仿真分析 沉降缝 small-scale hydropower plant foundation slab temperature stress simulation analysis settlement joint
  • 相关文献

参考文献2

二级参考文献6

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部