期刊文献+

锚杆横梁反力装置在岩溶地区桩基静载试验中的应用研究 被引量:3

Research on the Application of Bolt Counterforce Device for the Pile Staic Test in Karst Area
在线阅读 下载PDF
导出
摘要 针对岩溶地区的工程地质特性,在比较传统加载试验装置的适应性基础上,提出采用锚杆横梁反力装置做桩基静载试验的方法。根据工程实践经验同时结合FLAC3D软件的数值模拟分析,对锚杆横梁反力装置2个关键参数进行了研究,并给出了工程实际应用的推荐值。最后,通过一个工程应用实例,说明了锚杆横梁反力装置在岩溶地区的科学性、可行性。 In this paper videotaping the property of engineering geology in karst area, a bolt counterforce device is proposed for the pile static test based on the comparative studying the accommodation of the different traditional loading test devices. According to the experience of enginerring practice and based on the numeric silmulation and analysis using FLAC3D software ,the text studies two critical parameters of the bolt counterforce device , furthermore presents their recommended values in enginerring practice. At last, the text illuminates the scientificy and flexibility of the bolt counterforce device in karst area by analsysing a engineering example.
出处 《公路工程》 2009年第4期5-10,15,共7页 Highway Engineering
基金 西部交通建设科技项目(200531878618)
关键词 岩溶 灌注桩 静载试验 锚杆横梁反力装置 karst bored pile static test bolt counterforce device
  • 相关文献

参考文献10

二级参考文献62

共引文献1879

同被引文献27

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部