摘要
在电力工程建设中,由于施工现场的复杂性,常会遇到无法用常规方式进行起重机械拆卸的情况。本文以某实际工程为例,对H3/36B塔吊进行了自制吊梁的降节拆卸,介绍了其具体的操作方法,并进行了相关计算。
Because of the complexity of the construction site, the hoisting machinery always can't be dismantled with conventional methods in the power construction.In this paper, a practical engineering was taken as an example and the H3/36B tower crane was down dismantled by the self-made lifting beam. The concrete operation methods and the relevant calculation were introduced.
出处
《制冷空调与电力机械》
2009年第4期96-99,95,共5页
Refrigeration Air Conditioning & Electric Power Machinery
关键词
电力建设
塔吊
拆卸
construction
tower-crane
demolition