摘要
砂石加工系统是金鸡滩水利枢纽最重要的临建工程之一,以降低生产成本为目的,本工程采取了与地形地貌相结合布置、系统设置尽量简单实用等手段,实现了建设、生产成本较低,管理方便易行,产品质量合格的目标。文章总结建设过程的得失,为类似工程建设提供参考。
The aggregate processing system is one of the most important temporary works of Jinjitan Hydro Project. The system, arranged to be as simple and practical as possible by taking advantage of topcgraphic conditions, helps achieve reduction of construction and production costs, convenient and feasible management, and eligible product. The construction of the system is discussed in the paper, providing reference for similar projects.
出处
《红水河》
2009年第4期20-23,共4页
Hongshui River
关键词
砂石加工系统
设计
工艺流程
系统特点
运行管理
金鸡滩水电站
aggregate processing system
design
technological process
system characteristics
operation man-agement
Jinjitan Hydropower Station