基于对半组合法的导弹绝缘电阻测试

The Insulation Resistance Testing of Missile Based on Half Combined Method
在线阅读 下载PDF
导出
摘要 导弹检测过程中的绝缘电阻测试是一项重要工作。现常用的测试方法有分测法、并测法,可较准确地完成这项工作,但这两种方法操作步骤多、耗费时间长。经过数学分析,提出了一种新的测试方法:对半组合法,经实例表明:该方法可减少操作步骤,大大缩短导弹绝缘电阻测试时间。 The insulation resistance test is an important for missile test. Though the existing insulation resistance testing methods including respective testing method and shunt-wound testing method can accomplish this work, these two methods go through many operational steps and consume much time. Through mathematical analysis, a new testing method named half combined method was proposed. This new method can reduce operational process and time spent on missile insulation resistance test.
机构地区 海军潜艇学院
出处 《弹箭与制导学报》 CSCD 北大核心 2009年第4期248-250,共3页 Journal of Projectiles,Rockets,Missiles and Guidance
关键词 绝缘电阻 分测法 并测法 对半组合法 insulation resistance respective testing method shunt-wound testing method half combined method
  • 相关文献

参考文献4

二级参考文献6

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部