5Costa A F B, Rahim M A. Joint X and R Charts with Two- Stage Samplings [J].Quality and Reliability Engineering International, 2004,20(7).
6Lin Y C, Chou C Y. Adaptive X Control Charts with Sampling at Fixed Times[J].Quality and Reliability Engineering International, 2005,21 (2).
7Nikolaidis Y, Rigas G, Tagaras G. Using Economically Designed Shewhart and Adaptive X Bar-Charts for Monitoring the Quality of Tiles[J].Quality and Reliability Engineering International,2006,22 (3).
8Dyer J N, Conerly M D, Adams B M. A Simulation Study and Evaluation of Multivariate Forecast Based Control Charts Applied to ARMA Processes [J].Journal of Statistical Computations and Simulation, 2003,73(4).
9Jarrett J E, Pan X. The Quality Control Chart for Monitoring Multivariate Autocorrelated Processes[J].Computatianal Statistics & Data Analysis,2007,51 (21).
10Kalgonda A A, Kulkarni S R. Diagnosis of Multivariate Control Chart Signal Based on Dummy Variable Regression Technique[J]. Communications in Statistics:Theory and Methods,2003,32(8).