摘要 探讨了复杂产品研制过程中技术风险的内涵,建立了费用风险、进度风险、性能风险等三类技术风险之间的关系模型。考虑复杂产品研制过程的并行迭代特征,提出了一种基于设计结构矩阵的多层技术风险仿真评估模型。系统分析了性能风险对进度、费用风险的影响,并依此给出了一种两层抽样机制的仿真算法修正了传统仿真中仅考虑费用风险和进度风险的仿真偏差。在此基础上,给出了定量评估子项目或活动技术风险的似然估计值的方法,为复杂产品研制过程的风险控制提供了依据。 The concept of technical risk in complex product development process was discussed, and a relationship model for three type's technical risks (i.e. cost risk, schedule risk and performance risk) was established. A multilayer simulation model for technical risk assessment based on design structure matrix was proposed with considering'the concurrent and iterative characteristic of complex product development process. The effect of performance risk on schedule and cost risk during simulation assessment was adequately analyzed, and the deflection of traditional simulation assessment which considered only cost risk and schedule risk was corrected by a new simulation algorithm based on two layer sampling technique. Furthermore, a simulation algorithm was given to calculate probability and consequence of activity. It could assess the likelihood estimation of several risks of sub item or activity, and provided a criterion to control risk of development process according to risk value.
出处 《系统仿真学报》 CAS CSCD 北大核心 2009年第16期5207-5211,共5页 Journal of System Simulation
基金 国防基础科研项目(D2120060023-06)
关键词 产品研制过程 仿真 风险评估 设计结构矩阵 product development simulation risk assessment design structure matrix
  • 相关文献

参考文献9

  • 1Tyson R Browning. Modeling and Analyzing Cost, Schedule, and Performance in Complex System Product Development [D]. Massachusetts, USA: Massachusetts Institute of Technology, 1998.
  • 2Tyson R Browning, Steven D Eppinger. Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development [J]. IEEE Transaction on Engineering Management (S0018-9391), 2002, 49(4): 428-442.
  • 3徐哲,冯允成,鲁大伟.武器装备研制项目的技术风险评估[J].系统工程与电子技术,2005,27(6):1123-1127. 被引量:44
  • 4姚咏,范文慧,熊光楞.复杂产品开发过程仿真及其优化方法研究[J].系统仿真学报,2006,18(3):726-730. 被引量:20
  • 5Jeffrey K Pinto. Project management 2002 [J]. IEEE, Engineering Management Review (S0360-8581), 2002, 30(4): 4.
  • 6Tim Bedford, Roger Cooke, Probabilistic Risk Analysis: Foundations and Methods [M]. New York, USA: Cambridge University Press, 2001.
  • 7T M Williams. Practical use of distributions in network analysis [J]. Journal of Operational Research Society (S0160-5682), 1992, 43(3): 265-270.
  • 8Hisham M E, Han P Bao. A simulation-based Optimization Framework for Product Development Cycle Time Reduction [J]. IEEE Transaction on Engineering Management (S0018-9391), 2006, 53(1): 69-85.
  • 9Soo-Haeng Cho, Steven D Eppinger. A simulation-based process model for managing complex design projects [J]. IEEE Transaction on Engineering Management (S0018-9391), 2005, 52(3): 316-328.

二级参考文献18

  • 1程军伟,刘维平,迟宝山.装备研制中技术风险的灰色综合评估[J].装甲兵工程学院学报,2003,17(2):60-62. 被引量:11
  • 2姚咏,熊光楞,范文慧.产品开发过程智能化分析与改进[J].计算机集成制造系统,2004,10(8):886-891. 被引量:3
  • 3吕建伟,刘中华,高杰.舰船研制的技术风险问题分析[J].海军工程大学学报,2000,12(2):97-99. 被引量:15
  • 4S. E. Elmaghraby. Activity nets: A guided tour through some recent developments[J]. European Journal of Operational Research(S0377-2217), 1995, 82(3): 383-408.
  • 5D.V. Steward. The design structure system: A method for managing the design of complex systems[J]. IEEE Transactions on Engineering Management (S0018-9391), 1981, 28(3): 71-74.
  • 6S. D. Eppinger, D. E. Whitney, R. P. Smith, et al. A model based method for organizing tasks in product development[J]. Research in Engineering Design (S0934-9839), 1994, 6(1): 1-13.
  • 7K. B. Clark, S. C. Wheelwright. Managing New Product and Process Development[M]. New York: Free Press, 1993.
  • 8A. Y. Ha, E. L. Porteus Optimal timing of reviews in concurrent design for manufacturability[J]. Management Science (S0025-1909),1995, 41(9): 1431-1447.
  • 9K Neumann. Stochastic Project Networks: Temporal Analysis,Scheduling and Cost Minimization[M]. Berlin, Germany: Springer 1990.
  • 10Tyson R. Browning, Steven D. Eppinger. Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development[J]. IEEE Transaction on Engineering Management(S0018-9391), 2002, 49(4): 428-442.