摘要
以太原某工程后压浆灌注桩的桩基设计为例,详细介绍了新规范对于后压浆灌注桩的设计修正及在液化场地中桩基设计需要注意的问题。
Taking the pile foundation design of post grouting bored pile with an engineering project in Taiyuan City, this paper introduces the design modification in the new code on post grouting bored pile and some problems needing attentions in the pile foundation design on liquefaction site.
出处
《科技情报开发与经济》
2009年第22期186-188,共3页
Sci-Tech Information Development & Economy
关键词
桩基设计
后压浆灌注桩
结构设计
design of pile foundation
post grouting bored pile
structural design