二滩水电站拱坝基础固结灌浆效果综合分析

The comprehensive analysis on the effect of consolidation grouting in the foundation of Ertan Arch Dam
在线阅读 下载PDF
导出
摘要 二滩水电站大坝基础固结灌浆由世界著名的专业商TREVI基础公司负责施工,采用国际通用的FIDIC模式管理,施工信息反馈快,监理工程师决策快,是固结灌浆顺利实施的关键。大坝基础固结灌浆的设计、施工是先进的,特别是有盖重引管灌浆的方法,成功地解决了大坝混凝土浇筑与基础固结灌浆相互干扰的问题。 The consolidation grouting in the dam foundation of Ertan Hydropower Station is constructed by the TREVI foundation company and is managed on the basis of general international mode of FIDIC. Thus, the quick feedback of construction information and quick decision making of the Engineer are the key of smooth implementation of consolidation grouting. The technologies of design and construction of the consolidation grouting of dam foundation are advanced, especially the method of the weighted grouting successfully solves the problem of the inter disturbance between the concrete pouring of the dam and the consolidation grouting of the foundation.
出处 《水力发电》 北大核心 1998年第7期44-46,共3页 Water Power
关键词 固结灌浆 灌浆施工 水电站 拱坝基础 consolidation grouting, grouting design, grouting design, grouting construction, with cover heavy grouting, grouting effect, TREVI mode, Ertan Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部