期刊文献+

软弱围岩隧道施工中大变形的产生及对策 被引量:6

The Coming of Large Deformation in the Tunnel Construction in Weak Surrounding Rock and the Countermeasure
在线阅读 下载PDF
导出
摘要 介绍软弱围岩受地质构造作用,在隧道施工中产生大变形的机理和特点。根据现场施工情况,总结运用常规施工手段控制变形的施工措施,为类似地质条件下的隧道施工控制大变形的出现提供参考。 This paper introduces the mechanism and characteristics of large deformation of weak surrounding rock under the role of geological structure in tunnel construction. According to the experience gained at construction sites, the authors sum up the measures of using conventional construction methods to control deformation, and provide the reference to the control of large deformation in tunnel construction under similar geological conditions.
出处 《铁道技术监督》 2009年第7期21-23,共3页 Railway Quality Control
关键词 软弱围岩 隧道施工 隧道开挖 围岩变形 成因分析 对策 Weak Surrounding Rock Tunnel Construction Tunnel Excavation Deformation of Surrounding Rock Cause Analysis Countermeasure
  • 相关文献

同被引文献16

引证文献6

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部