摘要
介绍了福建炼化公司含硫污水汽提装置在工程设计和设备安装上存在的问题,分析了问题存在的原因并提出了改造方案,着重对汽提塔第一层塔盘和污水贮罐进行了改造。
In this paper, the problems in process designing and in stallation of equipment of sour wastewater stripping unit of Fujian Petrochemical Complex are recommeded the reason is analyzed and improvement is put forward and the first tray of stripping colurm and the wastewater tank were reconstructed.
出处
《石油化工环境保护》
1998年第1期16-18,共3页
Environment Protection in Petrochemical Industry