摘要
结合某隧道施工情况,就该隧道在松散堆积体下采取的特殊加固及支护方案进行了阐述,同时对隧道掘进施工中的重点以及施工中特殊情况的处理作了探讨,旨在通过对掘进施工过程控制,以确保隧道施工安全。
Combined with the construction of a tunnel, it illustrates the special strengthening and supporting plan of this tunnel under loose accumulation body. Meanwhile, it discusses the keys in the digging of tunnel construction and the special situations processing in construciotn, so as to guarangee construction safety through controlling digging process.
出处
《山西建筑》
2009年第21期315-316,共2页
Shanxi Architecture
关键词
隧道
松散堆积体
加固
掘进施工
tunnel, loose accumulation body, strengthen, digging construction