摘要
通过在开工前先进行固结灌浆生产性试验,以论证尾水边坡采用预灌浆的技术可行性及效果的可靠性;根据试验成果,以利于在大规模施工时调整与选择合适的施工参数,推荐合理的施工程序、良好的施工工艺、适宜的注浆材料和配合比。
The productive test of consolidation grouting was conducted before commencement to prove the pre-grouting technology feasibility and effect reliability for the tail water slope. Based on the test result, reasonable construction procedures, good construction techniques and suitable grouting materials and proportioning ratio were recommended, so as to adjust and select suitable construction parameters in large scale construction.
出处
《工程建设》
2009年第3期32-36,共5页
Engineering Construction
关键词
固结灌浆
边坡
施工参数
consolidation grouting
slope
construction parameter