试论工期固定—资源均衡优化的新方法 被引量:2

A New Method of Resource Leveling For the Project With Fixed Completion Time
在线阅读 下载PDF
导出
摘要 本文从衡量资源均衡的常用指标──方差值入手,寻找工期固定一资源均衡优化的新的判别式,提出利用时差逐步提前某些工作的最迟开始时间以达到削平资源高峰的方法,为工期固定—资源均衡的优化找到一条新的路径。 This paper seeks for a new method to find out the most preferred point at whichall resources could be leveled on a fixed completion time basis. By using mean square devia-tion-a common criteria to evaluate resource leveling the paper put forward a new approachofgradually advancing late start date of some activitics to level some resource need peak.
作者 孙震
出处 《北京建筑工程学院学报》 1998年第2期38-43,共6页 Journal of Beijing Institute of Civil Engineering and Architecture
关键词 工期固定 资源均衡 优化方法 施工计划管理 建筑 fixed completion time-resource leveling early start date mean square devia-tion daily resource need
  • 相关文献

同被引文献15

  • 1段延春.资源均衡优化的原理[J].大连铁道学院学报,1989,10(2):77-82. 被引量:2
  • 2Chan Weng-Tat, Daviad K H, Govindom K. Construction resource scheduling with genetic algorithms [ J ]. Journal of Construction Engineering and Management, ASCE , 1996,122(2) :125-132.
  • 3Padilla E M, Carr R I. Resource strategies for dynamic project management [ J ]. Journal of Construction Engineering and Management, ASCE , 1991,117(2): 279-293.
  • 4Shaikh Muzaffar A. A peak shaving approach to project staff reallocation [ J ]. Computers and Industrial Engineering,1998,35(1/2) : 129-132.
  • 5Talbot F B. Resource-constrained project scheduling with time-resource tradeoffs : The non-preemptive case[J ]. Management Science, 1982,28 : 1197-1210.
  • 6Kennedy J, Eberhart R. Particle Swarm Optimization [A].Proc IEEE Int Conf on Neural Networks [ C ]. Perth, 1995 : 1942-1948.
  • 7Eberhart R, Shi Yuhui. Particle Swarm Optimization : Developments, applications and resources [ A ]. Proc IEEE Int Conf on Evolutionary computation[ C]. Seoul, 2001:81-86.
  • 8Eberhart R C,Shi Y. Comparing inertia weights and constriction factors in particle swarm optimization [ A ]. Proc IEEE Int Conf on Evolutionary computation [ C ]. La Jolla, 2000:84-88.
  • 9Zhang Hong, LI Xiaodong, LiHeng, Huang Fulai. Particle Swarm Optimization-based schemes for resource-constrained project scheduling, www. elsevier.com/locate/autcon ,2004. 1.
  • 10田军,寇纪淞,李敏强.利用遗传算法优化施工网络计划[J].系统工程理论与实践,1999,19(5):78-82. 被引量:33

引证文献2

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部