该文提出在非电网路设计中采取增设交叉线路、网路闭合、多点激发,激发点捆联2至3发激发雷管及延时网路避免爆破飞石击砸网路等措施,可使非电网路设计可靠性得到提高。
In order to improve the design reliability of non-electric initiation system, several measures were put forward in this paper, such as increasing intersection routes and detonation points by binding up two or three detonators, closing nonel network, avoiding hit of the network from the flying stones by the reasonable selection of delay time, and so on.
出处
《爆破器材》
EI
CAS
北大核心
1998年第2期27-29,共3页
Explosive Materials
关键词
工程爆破
非电起爆网络
可靠性
爆破
拒爆
起爆
engineering blasting, non-electric initiation network, reliability, accurate detonation