摘要
本文以降低总费用,缩短总工期为目标,提出一种确定矿井建设最优施工方案决策关键线路法.通过对矿建工程特点的分析.建立了确定最优施工方案的模型;编制了电算程序;并对山西某矿井进行了计算.通过计算证明这种方法不仅可行而且经济效果显著.
In order to find out the optimal mine construction alternative. By which the total time and cost consumption can be reduced to a minimum, a modern method, decision critical path method (DCPM) , is intrduced in this paper. Based on the analysis of the mine planning is given, the computer program is writen, and some mine's optimal alternative in useful, by which an obvious economical effect can be obtained.
关键词
矿建工程
施工方案
关键线路法
Decision critical path method
optimal construction alternative
construction
precedence relationship between activities
economical effect