期刊文献+

多星联合任务规划中不同迭代修复策略比较研究 被引量:4

A Comparison of Iterative Repair Strategies for Earth Observing Satellites Imaging Scheduling
在线阅读 下载PDF
导出
摘要 对地观测卫星任务规划需要对参与规划的任务安排卫星成像窗口,问题优化目标是在不违反约束的情况下,最大化安排任务的重要性评价值,是一类典型的过载规划问题。引入迭代修复算法思想对多类型卫星任务规划问题进行求解,设计了迭代修复算法流程,给出基于成像概率、基于时间序和基于随机选择的三种不同的启发式策略,并结合不同的贪婪初始解生成策略进行比较研究。实验结果表明,基于随机选择的启发式策略在改进问题解上表现最优,而结合领域知识的初始解能有效提高算法收敛速度。 Earth Observing Satellites imaging scheduling problem needs to assign time slot of the participated satellites to the tasks, the object of which is to maximize the total evaluation of the assigned tasks without constraint violation, thus is an oversub- scribed scheduling problem. As iterative repair method is successfully used in the oversubscribed scheduling problem, we propose an iterative repair based heuristic method to solve it. We redesign the task selection and re - arranging procedure, and try some heuristic methods to test the performance, combined with different greedy initializing methods. These heuristic methods include time-sequence based search, photo-probability based search and stochastic search. Finally, we compare these approaches on two types of data-sets. The result shows that, stochastic search performs best, while good heuristic initialize method can make the con- vergence speed rapider.
出处 《宇航学报》 EI CAS CSCD 北大核心 2009年第3期1255-1260,共6页 Journal of Astronautics
基金 国家自然科学基金(60604035) 国家863高技术研究发展计划(2007AA12Z229)
关键词 对地观测卫星 任务规划 启发式搜索 迭代修复 Earth observing satellite Imaging scheduling Heuristic search Iterative repair
  • 相关文献

参考文献10

  • 1Smith D E,Frank J,Jonsson A K.Bridging the gap between planning and scheduling[J].Knowledge Engineering Review,2000,15(1):47-83.
  • 2Barbulescu L.Oversubscribed Scheduling Problems[R].Technique Report.http://wwwmath.cndenver,edu/-billups/courses/ma5779/papers/laura-proposal,pdf,2002.
  • 3Johnston M D,Miller D.Spike:Intelligent Scheduling of Hubble Space Telescope Obscrvations[M].Michael B.Intelligent Scheduling,Morgan:Morgan Kaufmann Publishers,1994:391-422.
  • 4Chien S,Knight R,Stechert A,Sherwood R,Rabideau G.Using iterative repair to increase the responsiveness of planning and scheduling for autonomous spacecraft[C]// Proc.5th Intl.Conf.on Artificial Intelligence Planning and Scheduling (AIPS-00),2000.
  • 5Globus A,Crawford J,Lohn J,Pryor A.A comparison of techniques for scheduling earth observing satellites[C]//Proc.of the 9th National Conference on Artifficial Intelligence (AAAI-04),2004.
  • 6王钧,李军,陈健,郭玉华,景宁.多目标EOSs联合成像调度方法[J].宇航学报,2007,28(2):354-359. 被引量:33
  • 7Kramer L,Smith S.Maximizing flexibility:A retraction heuristic for oversubscribed scheduling problems[C]//Proceedings of 18th International Joint Conference on Artificial Intelligence,2003.
  • 8Zweben M,Daun B,Davis E,Deale M.Scheduling and rescheduling with iterative repair[J].IEEE Transactions on Systems,Man,and Cybernetics,1993,23(6):1588-1596.
  • 9Globus A,Crawford J,Lohn J,Morris R.Scheduling earth observing fleets using evolutionary algorithms:problem description and approach[C]//Preceedings of the 3rd International NASA Workshop on Planning and Scheduling for Space,2002.
  • 10Potin P.End-to-End planning approach for earth observation mission exploitation[C]//SpaceOps,1998,Tokyo,Japan,June,1998.

二级参考文献9

  • 1张帆,李军,王钧,景宁.基于有效准则矢量生成的成像调度方法[J].航天控制,2005,23(6):81-84. 被引量:4
  • 2Michel V,Jin-Kao Hao.2003 upper bounds for the SPOT 5 daily photograph scheduling problem[J].Journal of Combinatorial Optimization,2003,7:87-103
  • 3Bensana E,et al.Exact and approximate methods for the daily management of an earth observation satellite[C].Proceedings of SpaceOps-96,Germany,1996
  • 4Harrison S A,Price M E.Task scheduling for satellite based imagery[C].Proceedings of the Eighteenth Workshop of the UK Planning and Scheduling Special Interest Group,University of Salford,UK,1999:64-78
  • 5Lin W C,et al,Daily imaging scheduling of an earth observation satellite,IEEE Transaction on Systems,Man,and Cybernetics part A:system and humans.March 2005,35(2):213-223
  • 6Muraoka H,et al.Aster observing scheduling algorithms[C]//Proceedings of SpaceOps-98,Tokyo,Japan,1998
  • 7Garey M,Johnson D.Computers and Intractablility:A Guide to the Theory of NP-Completeness[M].San Francisco:W.H.Freeman & Company,Publisher,1979:212-214
  • 8E.Zitzler M,Laumanns and L.Thiele.SPEA2:Improving the Strength Pareto Evolutionary Algorithm[M].Swiss Federal Institute of Technology(ETH),Zurich,Switzerland.Technical report TIK-Re-port 103,May.2001
  • 9代树武,孙辉先.卫星的智能规划与调度[J].控制与决策,2003,18(2):203-206. 被引量:18

共引文献32

同被引文献48

引证文献4

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部