摘要
结合广东清远抽水蓄能电站下水库工程,对导流洞改建泄洪洞的进口形式进行了综合研究。通过水工模型试验优化体型,改善进口流态,为进口设计提供了依据。
In combination with the project of lower reservoir of pumped storage power stations in Qingyuan, Guangdong, an integrated research on inlet is made to rebuild diversion tunnels into spillway tunnels. Optimizing style and improving flow pattern of inlet by using hydraulic model experiments serves as a reference for design of inlet.
出处
《中国农村水利水电》
北大核心
2009年第6期154-157,共4页
China Rural Water and Hydropower
关键词
导流洞改建泄洪洞
竖井
旋涡式旋流
开敞式堰流
rebuilding diversion tunnels into spillway ttmnels
gyrating shaft well
vortexing swirl flow style
opening weir flow style