摘要
作者分析利用嘉陵江合川水利枢纽的勘探试验资料,阐明了建坝岩体中的石膏脉、层间剪切带、层间裂隙水等主要地质问题,并对以上地质缺陷进行了工程地质评价,提出了处理的建议。
Based on the data from exploration and experiment in the Hechuan Hydro junction, Jialing River, the major geological problems concerning the dam site rock masses such as the gypsum veins, interlayer shear zones and interlayer fissure water are elucidated, with the engineering geological assessment on these geological defects made and the proposals on their treatment put forward.
出处
《水文地质工程地质》
CAS
CSCD
1998年第4期36-37,45,共3页
Hydrogeology & Engineering Geology
关键词
石膏脉
坝址
工程地质
层间裂隙水
岩体
hydro juction, gypsum vein, interlayer shear weakness zone, interlayer fissure water