期刊文献+

西藏旁多水利枢纽坝基深厚覆盖层渗透稳定性研究 被引量:3

Study on seepage stability of deep overburden for dam foundation of Pangduo hydro project in Tibet
在线阅读 下载PDF
导出
摘要 由于坝基为深厚覆盖层,因受到技术经济条件的制约,,不能采用完全封闭的基础处理措施,因此带来坝基的渗漏及渗透稳定问题。文章通过对旁多水利枢纽深厚覆盖层渗透稳定进行分析,突破规范规定提出冰水堆积层的允许比降值选用0.4为宜。 Because of the deep overburden and technic-economical condition restriction,the completely closed foundation treatment measures cannot be adopted,which is lead to the dam foundation seepage and its stability problems.By analyzing the seepage stability of deep overburden for Pangduo hydro project,the paper puts forward the allowable gradient ratio of ice water accumulation breaking through the criterion,that the value 0.4 is the suitable.
出处 《东北水利水电》 2009年第6期4-8,共5页 Water Resources & Hydropower of Northeast China
关键词 深厚覆盖层 冰水堆积物 渗透稳定 水力比降 deep overburden ice water accumulation seepage stability hydraulic gradient ratio
  • 相关文献

参考文献5

二级参考文献40

  • 1IstominaVS.土的渗流稳定性[M].[s.l.]:[s.n.],1957..
  • 2LuebotsjkovEA.无粘性非管涌土及其在水工建设中的应用(渗流译文汇编第二辑)[Z].南京:南京水利科学研究院,1961..
  • 3LuebotsjkovEA.确定无粘性土管涌性的图解法和分析法[M].[s.l.]:[s.n.],1965..
  • 4王韦 沈景中.砂砾土渗透变形的研究[R].南京:南京水利科学研究院,1964..
  • 5Terzaghi K. Theoretical Soil Mechanics[M]. New York:Wiley, 1943.
  • 6Skempton A W, Brogan J M. Experiments on piping in sandy gravels[J]. Geotechnique, 1994, 44(3): 449-460.
  • 7Kenney T C, Lau D. Internal stability of granular filters[J].Can. Geotech. J. 1985, 22(2): 215-225.
  • 8Pilarczyk K W. Dikes and Revetments[M]. Rotterdam:[s.n.], 1998.
  • 9Busch K F, Luckner L. Geohydraulik[M]. [s.l.]: Leipzig,1973.
  • 10Kovacs G. Seepage Hydraulics[M].Budapest:[s.n.],1981.