该文详细介绍了青岛海湾大桥接线工程的工程概况、技术标准、总体设计及立交与匝道的设置,工程设计中体现了在满足交通功能的前提下,近远期结合,充分利用现状和考虑城市景观环境的需要,因地制宜确定立交方案,降低工程投资的设计思想。
The article introduces in detail the general situation,technical standard,overall design,and construction of grade separation and ramp of Qingdao Gulf Bridge Connection Project.Under the premise of meeting the traffic function,the engineering design reflects the combination of the short term with the long term,fully utilizes the present situation and considers the demand of the urban landscape environment,and introduces the design thinking of determining the scheme of grade separation in line with local conditions and decreasing the engineering investment.
出处
《城市道桥与防洪》
2009年第5期13-16,共4页
Urban Roads Bridges & Flood Control
关键词
青岛海湾大桥
接线工程
技术标准
总体设计
立交与匝道
Qingdao Gulf Bridge,connection project,technical standard,overall design,grade separation and ramp