期刊文献+

CPR1000核电机组二回路系统稳态运行期间的放射性源项计算 被引量:3

STUDY ON COMPUTATIONAL MODELS OF SECONDARY SOURCE TERMS FOR NORMAL OPERATION OF CPR1000 NUCLEAR POWER PLANTS
在线阅读 下载PDF
导出
摘要 本文在CPR1000核电机组二回路系统放射性物质产生、转移、去除等机理的基础上确定了二回路系统放射性源项的计算模型。计算结果表明,与根据法国的假定和相关设计参数取值得到的结果相比,本文所得源项计算结果要比法国提供的同类机组的源项结果更为保守;而按单台0.5kg/h稳定泄漏率假定得到的计算结果则远小于法国提供的同类机组的源项计算结果。 Computational models of secondary source terms of normal operation is established with CPR1000 nuclear power plants based on the overall process of production, transportation, decontamination of secondary radioactive materials. The results computed with this model and assumption of France is more conservative than that provided by France, but the results computed with ANSI/ANS-18.1-1999 assumption is far less than that provided by France.
出处 《辐射防护》 CAS CSCD 北大核心 2009年第3期135-138,153,共5页 Radiation Protection
关键词 核电机组 二回路 气载放射性 液态放射性 Secondary Loop, Liquid Radioactive Source Terms, Gas Radioactive Source Terms
  • 相关文献

参考文献1

  • 1ANSI. Radioactive source term for normal operation of light water reactors. ANSI/ANS-18.1. 1999.

同被引文献5

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部