木瓜矿煤层上行开采可行性分析 被引量:4

The Feasibility of Ascending Mining in Mugua Coal Mine
在线阅读 下载PDF
导出
摘要 在对木瓜矿煤层赋存条件进行分析的基础上,对煤层上行开采可行性进行了分析。利用比值分析、"三带"分析、围岩平衡和类比分析等方法对上行开采进行了可行性研究。特别是利用数值计算软件FLAC对9#煤开采造成的裂隙带高度、5#煤底板破坏深度进行计算并与理论计算结果相互验证,对两个煤层的连通情况进行分析。结果表明,木瓜煤矿上行开采具有较好的可行性和经济性。 Based on the analysis of the occurrence conditions Mugua coal mine, the feasibility of coal seam ascending mining was analyzed. The methods of ratio analysis, three - zone analysis, surrounding rock balance and analogy analysis were introduced. The height of fractured zone caused by the mining of 9# coal seam and the failure depth of seam floor were calculated, the result were verified by the theoretical calculation each other, the connectivity of fracture between two seams was calculated. The result shows that the ascending mining of Mugua coal mine is feasible and economical.
作者 张志康
出处 《山西焦煤科技》 2009年第4期14-16,共3页 Shanxi Coking Coal Science & Technology
关键词 近距煤层 上行开采 可行性 数值模拟 Near distance coal seam group Ascending mining Feasibility Numerical simulation
  • 相关文献

参考文献2

  • 1李曦滨.木瓜矿9^#煤对5^#煤上行开采影响可行性论证报告[R].中国煤炭地质总局华盛水文地质堪察工程公司,2008.
  • 2谢文兵.采矿工程问题数值模拟研究与分析[M].徐州:中国矿业大学出版社,2006:76-79.

共引文献4

同被引文献10

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部