期刊文献+

桥墩组中轴线与水流方向夹角对河流流场影响的数值模拟研究 被引量:7

Numerical Simulation Research on the Affection of the Bigger Angle Between the Middle-line of the Piers Group and the River Flow
在线阅读 下载PDF
导出
摘要 采用平面二维数学模型,在理想矩形水槽中对不同夹角下桥墩组对流场的影响及桥墩优化布置进行了研究,并通过工程实例计算进行了进一步印证,结果表明:将左右幅桥墩错开布置可较好地减少因桥墩组中轴线与水流方向夹角过大而引起的对河流流场造成的不利影响。 Using the plane 2-D mathematical model, this paper carried out the research for the affection of the piers group with different angles to the flow direction and piers group optimal layout in an ideal rectangular flume, then verified the results of the study by the practical project. The results make cheat that stagger layout of the left pier and the right pier can reduce the affection to the direction of the flow by the big angle with the piers group.
作者 吴飞
出处 《水资源与水工程学报》 2009年第2期75-78,共4页 Journal of Water Resources and Water Engineering
关键词 桥梁 数学模型 河流流场 桥墩错开布置 bridge mathematical model river flow piers dispasing staggerly
  • 相关文献

参考文献3

  • 1黄绳武.桥梁施工及组织管理[M].北京:人民交通出版社,1999.271.
  • 2谢鉴衡.河流模拟[M].北京:中国水利水电出版社,1988..
  • 3陈景仁[美].湍流模型及有限分析法[M].上海:上海交通大学出版社.1989.

共引文献56

同被引文献35

引证文献7

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部