摘要 对软件成本估算方法进行合理评价,进而从当前众多软件成本估算方法中选择最合适的一种是十分重要的。在软件成本估算方法的评价体系的基础上,采用模糊评价与灰色理论相结合的综合评价方法对各估算方法进行评价,进一步通过实例证明该评价方法可以合理有效的评价软件成本估算方法,对软件开发项目实践有参考价值. It is very important to evaluate software cost estimation method reasonably and subsequently select the most suitable one from current lots of software cost estimation methods. On the basis of the evaluation framework of software cost estimation methods, Fuzzy-Grey comprehensive evaluation method which combines fuzzy evaluation and grey theory is used in the evaluation of software cost estimation methods. Eventually, through an example the evaluation method is proved to be useful and feasible for evaluating estimation methods and have practice reference for software development.
作者 张冰 张汝波
出处 《小型微型计算机系统》 CSCD 北大核心 2009年第5期895-898,共4页 Journal of Chinese Computer Systems
关键词 软件成本估算方法 评价体系 模糊评价 灰色理论 software cost estimation method evaluation framework fuzzy evaluation grey theory
  • 相关文献

参考文献10

  • 1Glass R L.Facts and fallacies of software engineering[M].Boston:Addison-Wesley,2003.
  • 2Boehm B W,Valerdi R,Lane J,et al.COCOMO suite methodology and evolution.CrossTalk[J].The Journal of Defense Software Engineering,2005,18(4):20-25.
  • 3Jrgensen M.A review of studies on expert estimation of software development effort[J].Journal of Systems & Software,2004,70(1-2):37-60.
  • 4Shepperd M,Schofield C.Estimating software project effort using analogies[J].IEEE Trans.on Software Engineering,1997,23(12):736-743.
  • 5http://www.costxpert.com.
  • 6Boehm B W,Valerdi R.Achievements and challenges in software resource estimation[R].No.USC-CSE-2005-513,Lodz:Transfer Multisort Elektronik,2005.
  • 7Briand L C,Wieczorek I.Resource estimation in software engineering[A].//Marcinak JJ,ed.Encyclopedia of Software Engineeringu[M].New York:John Wiley & Sons,2002,1160-1196.
  • 8Vito F Uricchio,Raffaele Giordano,Nicola Lopez.A fuzzy knowledge-based decision support system for groundwater pollution risk evaluation[J].Journal of Environmental Management,2004(73):189-197.
  • 9S-P Lo.The application of an ANFIS and grey system method in turning tool-failure detection[J].The International Journal of Advanced Manufacturing Technology,2002(19):564-572.
  • 10李明树,何梅,杨达,舒风笛,王青.软件成本估算方法及应用[J].软件学报,2007,18(4):775-795. 被引量:66

二级参考文献68

  • 1Kemerer CF.An empirical validation of software cost estimation models.Communications of the ACM,1987,30(5):417-429.
  • 2Navlakha JK.Choosing a software cost estimation model for your organization:A case study.Information and Management,1990,18(5):255-261.
  • 3Srinivasan K,Fisher D.Machine learning approaches to estimating software development effort.IEEE Trans.on Software Engineering,1995,21(2):126-137.
  • 4Shepperd M,Cartwright M.Predicting with sparse data.IEEE Trans.on Software Engineering,2001,27(11):987-998.
  • 5McGibbon T.Modern cost estimation tools and modern empirical cost and schedule estimation tools.1997.http://www.dacs.dtic.mil/techs/estimation/title.shtml
  • 6Boehm BW,Clark B,Horowitz E,Westland C.Cost models for future software life cycle processes:COCOMO 2.0.Annals of Software Engineering,1995,1:57-94.
  • 7Boehm BW,Valerdi R,Lane J,Brown A.COCOMO suite methodology and evolution.CrossTalk:The Journal of Defense Software Engineering,2005,18(4):20-25.
  • 8Boehm BW,Royce W.Ada COCOMO and the Ada process model.In:Proc.of the 5th Int'l COCOMO User's Group Meeting.Pittsburgh,1989.
  • 9Boehm BW,Clark B,Chulani S.Calibration results of COCOMO Ⅱ 1997.In:Proc.of the 22nd Software Engineering Workshop.1997.
  • 10Chulani S,Boehm BW,Steece B.Calibrating software cost models using Bayesian analysis.Technical Report,USC-CSE-98-508,1998.

共引文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部