摘要
根据金沙江向家坝水电站重大件设备的运输要求,对向家坝重大件专用码头的航道条件、港址选择、装卸工艺、平面布置等进行了细致的分析研究。该码头所在河段岸坡较缓,水位变幅和水边线摆动均较大,采用实体斜坡道码头结构形式以及改进的顶推和滚装装卸工艺,解决了重大件运输水陆转运的装卸问题,可作为类似工程的参考。
According to the transporting need of the heavy cargo for Xiangjiaba hydropower station in Jinshajiang River,the following questions on the heavy cargo special wharf are studied,such as the waterway condition,site selection,handling technology,plane layout,etc.Because of the gentle bank slope,larger range of the water level change and water sideline wing at the wharf,the sloping type wharf and the improved incremental launching and roll-on roll-off handling technology are adopted.The loading and unloading problem of the water-land transfer of the heavy cargo is solved.It can be used for reference in similar projects.
出处
《水运工程》
北大核心
2009年第4期88-92,共5页
Port & Waterway Engineering
关键词
重大件码头
装卸工艺
向家坝水电站
heavy cargo wharf
handling technology
Xiangjiaba hydropower station