摘要
结合目前国内提出的几个600 MW超临界空冷供热机组项目,通过大量的调研工作,以300 MW,600 MW湿冷供热机组到300 MW,600 MW空冷供热机组机型转换的技术路线为主线进行分析,论证600 MW超临界空冷供热汽轮机的可行性和可靠性。
According to the requirement of energy saving policy in China, the development of high-parameters and high-capacity power generating units have become an inevitable trend in the future. Based on the study of several 600 MW super critical air cooling / and heat supply units projects, the paper expounds and proves the reliability and feasibility of 600 MW super critical air cooling and heat supply turbine through the development analysis of the power generating units from 300 MW, 600 MW wet cooling and heat supply units to 300 MW, 600 MW air cooling and heat supply units.
出处
《山西电力》
2009年第A01期13-15,75,共4页
Shanxi Electric Power
关键词
600
MW超临界
空冷
供热
汽轮机
可行性
可靠性
600 MW super critical
air cooling
heat supply
turbine
feasibility
reliability