不良地质条件对TBM施工的影响与探讨 被引量:5

Adverse Geological Conditions' Effect and Analysis on Tunnel Boring Machine Construction
在线阅读 下载PDF
导出
摘要 与钻爆法开挖地下工程相比,TBM法具有其独特的优势,然而TBM对各种不良地质条件的适应能力却不如钻爆法那样全面,结合TBM施工的工程实践,在深入分析多种不良地质条件对双护盾TBM施工的严重影响后,论述了不良地质条件中的相关工程地质问题,总结了应对不良地质条件的对策,阐明TBM法施工的成败与前期地质勘察精度有直接的和重要的关系。分析结果对今后类似地下工程在选择TBM施工时具有一定的参考意义。 Compared with drilling & bursting method,TBM method has a lot of particular advantages for excavation underground engineering. TBM can not fit with all kinds of adverse geological conditions just like drilling & bursting method. Based on TBM excavation engineering practice, some problems existed in adverse geological conditions are expounded after in-depth analysis of the effect of adverse geological conditions on double shield TBM. The countermeasures are also summarized facing adverse geological conditions. The success of TBM construction is of direct and important connection with the geological exploration precision. The result has great reference to TBM construction of the similar underground projects.
出处 《中国钨业》 CAS 2009年第2期44-47,共4页 China Tungsten Industry
基金 教育部"春晖计划"国际合作科研项目(Z2006-1-61005)
关键词 隧道 双护盾TBM 不良地质条件 松散性围岩 化学灌浆 tunnel double shield TBM adverse geological conditions incompact surrounding rock chemical grouting
  • 相关文献

参考文献5

二级参考文献20

  • 1苏华友,张继春,史丽华.TBM通过不良地质地段的施工技术[J].岩石力学与工程学报,2005,24(9):1635-1638. 被引量:26
  • 2张镜剑 李典璜 薛继洪 王思敬 杨志法 傅冰骏.长大隧道掘进机的应用及其主要岩石力学问题的处理[A].王思敬,杨志法,傅冰骏.中国岩石力学与工程世纪成就[M].南京:河海大学出版社,2004.582-597.
  • 3国家电力公司昆明勘测设计研究院.掌鸠河引水供水工程土建I标招标文件[R].昆明:掌鸠河引水供水工程建设管理局,2002..
  • 4Yassaghi A, Salari-Rad H. Squeezing rock conditions at an igneous contact zone in the Taloun tunnels, Tehran-Shomal freeway, Iran: a case study[J]. International Journal of Rock Mechanics and Mining Sciences, 2005, 42: 95 - 108.
  • 5Egger P. Design and construction aspect of deep tunnels(with particular emphasis on strain softening rocks)[J]. Tunnelling and Underground Space Technology, 2000, 15(4): 403 - 408.
  • 6Shalabi F I. FE analysis of time-dependent behavior of tunneling in squeezing ground using two different creep models[J]. Tunnelling and Underground Space Technology, 2005, 20(2): 271 - 279.
  • 7Goel R K, Jethwa J L, Pathankar A G. Indian experience with Q and RMR system[J]. Tunnelling and Underground Space Technology,1995, 10(1): 97- 109.
  • 8Dalgic S. Tunneling in fault zones, Tuzla tunnel, Turkey[J].Tunnelling and Underground Space Technology, 2003, 18(4):453 - 465.
  • 9Barton N. TBM Tunneling in Jointed and Faulted Rock[M].Rotterdam: A.A. Balkema, 2000.61 - 64.
  • 10Shang Y J, Xue J H, Wang S J, et al. A case history of tunnel boring machine jamming in an inter-layer shear zone at the Yellow River Diversion Project in China[J]. Engineering Geology, 2004, 71:199 - 211.

共引文献191

同被引文献16

引证文献5

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部