摘要
提出了大型土石方工程调配方案的大系统等式约束条件的线性规划,能够解决多变量的调配方案优化问题,实际应用效果很好.
Linear programming with equality constraints in large scale system of redeploying scheme in large earth and stone work is put forward and it can solve the optimization problems of redeploying scheme with lofs of inconstants. It is of good practical use.
出处
《武汉水利电力大学学报》
CSCD
1998年第1期92-94,共3页
Engineering Journal of Wuhan University