摘要
结合阿尔及利亚东西高速公路PK227+000-PK279+147段级配碎石的施工,从设计、施工工艺和施工组织的角度,探讨了国外高速公路级配碎石施工质量控制过程和控制要点。在遵循国外技术规范下,在施工工艺和检测标准上对比了与国内同类级配碎石施工的不同之处。
Combining with the construction of graded broken stone at PK227 + 000--PK279 + 147 section of east west highway in Algeria, the quality control process and control points of graded broken stone construction of foreign highway were discussed from design, construction technique and construction organization. The different points between foreign construction and national same kind of graded broken stone construction were compared from construction technique and testing standard following the foreign technical specification.
出处
《山西建筑》
2009年第11期263-265,共3页
Shanxi Architecture
关键词
高速公路
级配碎石施工
技术
highway, graded broken stone construction, technique