摘要
通过对太原选煤厂原煤卸车系统的改造,实现了原煤卸车系统的全自动运行,降低了职工的劳动强度,提高了原煤的小时处理能力。
Through transformation of raw coal unloading system in Taiyuan Coal Preparation Plant, the auto-operation of raw coal unloading system was realized, the labor intensity of workers was reduced, and the handling capacity of raw coal was improved.
出处
《煤质技术》
2009年第2期68-69,共2页
Coal Quality Technology
关键词
卸车系统
选煤
改造
应用
unloading system
coal preparation
transformation
application