基于前摄策略的项目调度优化方法研究

Optimization algorithm for project scheduling with proactive strategy
在线阅读 下载PDF
导出
摘要 为了解决不确定性因素对项目调度造成的扰动,在综合考虑项目资源紧张度、网络图结构复杂度等因素影响的前提下,对关键链和非关键链分别添加适当时间缓冲,减小了不确定性因素带来的扰动,提高了项目调度的健壮性。在此基础上提出以在制品水平和净成本最低为目标的项目调度优化方法;最后通过大量仿真验证,结果表明该方法优于文献中的项目调度方法。 For solving the disturbances caused by uncertain factors of the project scheduling, respectively added appropriate time buffers to critical chain and non-critical chain under considering the effects of project resource intensity and network struc- ture complexity which lowered the disturbances caused by uncertain factors and enhanced the project scheduling robustness. Based on this, proposed the project scheduling optimization method to minimize the level of the products and the net cost. Fi- nally by a large number of simulations verifying, the results show that this method works successfully and is superior to other project scheduling methods.
出处 《计算机应用研究》 CSCD 北大核心 2009年第4期1294-1296,1310,共4页 Application Research of Computers
基金 哈尔滨市后备带头人基金资助项目(2004AFXXJ039)
关键词 前摄策略 不确定性 健壮性 关键链 时间缓冲 proactive strategy uncertainty robustness critical chain time buffering
  • 相关文献

参考文献14

  • 1刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:71
  • 2丁然.不确定条件下鲁棒性生产调度的研究[D].济南:山东大学,2007:1-3.
  • 3LAMBRECHTS O, DEMEULEMEESTER E, HERROELEN W. Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities [ J]. Journal of Scheduling, 2007, 11(2) :121- 136.
  • 4AYTUG H, LAWLEY M, McKAY K, et al. Executing production schedules in the face of uncertainties : a review and some future directions [ J]. European Journal of Operational Research, 2005, 161(1) : 86-110.
  • 5GOLDRATT E M. Critical chain [ M ]. Great Barrington: North River Press, 1997 : 16- 20.
  • 6HERROELEN W, LEUS R. On the merits and pitfalls of critical chain scheduling[ J]. Journal of Operations Management,2001, 19 (5) :559- 577.
  • 7刘士新,王梦光,唐加福.资源受限工程调度问题的优化方法综述[J].控制与决策,2001,16(B11):647-651. 被引量:24
  • 8TABARES L V, FERRERIA J A, COELHO J S. On the optimal management of project risk [ J]. European Journal of Operational Research, 1998, 107(2) :451-469.
  • 9NEWBOLD R C. Project management in the fast lane-applying the theory of constraints [ M ]. Cambridge : St Lucie Press, 1998 : 1- 5.
  • 10张静文,胡信布,王茉琴.关键链项目计划调度方法研究[J].科技管理研究,2008,28(3):280-283. 被引量:18

二级参考文献67

共引文献190

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部