摘要
针对该矿铜铅锌嵌布关系复杂、各矿物可浮性相近、矿物间干扰大,根据铅锌矿的工艺矿物学特点,采用半优先浮选工艺,在各程序最佳条件下,成功解决了该多金属硫化矿石中铜、铅、锌的分离难题,同时其他元素也得到综合回收。
There was complex dissemination relation, close flotability between minerals and much inerference between minerals in the polymetallic copper-lead-zinc sulfide ore. In the light of process mineralogy characteristics of the copper-lead-zinc ore, half preferential flotation process was adopted. Under optimum conditions of every process, it successfully separated copper, lead and zinc from a polymetallic sulfide ore, meanwhile other elements were recovered comprehensively.
出处
《现代矿业》
CAS
2009年第3期41-43,共3页
Modern Mining
关键词
铜铅锌多金属矿
半优先浮选流程
综合回收
Polymetallic copper, lead and zinc ore
Half preferential flotation process
Comprehensive recovery