介绍了安徽华电芜湖发电有限公司一期2×660MW超超临界机组电气系统的设计与主要设备选型的特点,针对该设计方案调试运行中出现的问题,为今后设计和施工提出了几点建议。
This paper roundly introduces the design of electric system and main equipments lectotype features of 2 × 660 MW ultra-supercritical unit in Anhui Huadian Wuhu Electric Power Corporation Limited First-term Project, concurrently aiming at the merits & demerits of this design scenario and problems occurred in commissioning, several advices which should be noticed were proposed for the forthcoming design and working.