摘要
水质自动监测系统由中心站和水质自动监测子站组成,在全国范围内已经得到了广泛的应用。当地环境监测部门有责任对自动监测系统的建设进行参与和监督。本文分别从水质自动监测系统基础建设前期、基础建设时期、系统建设时期、试运行等各个阶段指出了系统建设应注意的问题。
The water quality automatic monitoring system consists of central station and water automatic monitoring branch station, this model has been extensively applied in the scope of whole country. Local environmental monitoring departments are responsible for involvement and supervision of automatic monitoring system construction. Some problems of system construction are pointed out during pre - construction stage, basic construction stage, systematic construction stage and trial operation of water quality automatic monitoring system.
出处
《内蒙古环境科学》
2008年第6期88-90,共3页
Inner Mongolia Environmental Protection
关键词
自动监测系统
建设
问题
automatic monitoring system
construction
problem