摘要 通过对某穿越湿陷性黄土地层隧道某塌方段地层-结构法和荷载-结构法的数值对比计算分析,表明虽然隧道上方塌陷后原状土体结构遭到破坏,但在围岩与衬砌支护结构变形协调的共同作用过程中,塌陷区黄土围岩的承载潜力仍要考虑到计算中,单纯的荷载结构法计算不能充分反映衬砌支护结构受力、变形的实质,采用地层结构法计算更符合实际情况;同时,根据塌陷段地质情况,采取了地表深孔注浆加固地层的处治方案,通过现场试验分析、论证,表明该处治方案合理、有效,较好地实现了地层加固的目的。 Numerical study and comparison analysis of stratum-structure and load-structure in a collapse area of a tunnel which runs through collapsible loess stratum indicate that loading potentiality of loess surrouding rock in collapse area still needs to be taken into consideration in the interaction of surrouding loess and lining supporting structure. Load-structure analysis fails to fully reflect the real stress and displacement of lining supporting structure, stratum-structure analysis is more suitable for the real situation in this case. Meanwhile, according to the geologic situation of collapse area, deep hole grouting from the ground surface is applied to strengthen the surrounding rocks and collapsing stratum. Site experiment analysis and reasoning justify the rationality and effectiveness of this stratum reinforcement practice.
作者 景韧 王永刚
出处 《公路》 北大核心 2009年第2期205-209,共5页 Highway
关键词 隧道工程 黄土围岩 湿陷 地表塌陷 施工控制 tunnel engineering loess surrounding rock collapsibility surface collapsing construction control
  • 相关文献

参考文献4

二级参考文献4

  • 1夏才初.地下工程测试理论与监测技术[M].同济大学出版社,..
  • 2.JTJ026—90.《公路隧道设计规范》[S].北京:人民交通出版社,1990..
  • 3.TB10003—99.《铁路隧道设计规范》[S].北京:中国铁道出版社,1999..
  • 4.《铁路工程设计技术手册》[M].北京:中国铁道出版社,1995..

共引文献45

同被引文献38

引证文献8

二级引证文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部