整体式桥台桥梁的简化计算模型研究 被引量:3

Research on Simplified Calculating Model of Integral Abutment Bridges
原文传递
导出
摘要 提出了整体式桥台桥梁在成桥阶段计算的三维框架简化模型;然后在ANSYS基础上进行二次开发,编制了计算桩基的等代桩长和台后土压力合力的专用分析程序IABS。利用IABS程序,结合国内现有的桥梁设计软件,即可直接进行整体式桥台桥梁的实际工程设计,为该类桥梁在我国的推广应用提供了设计基础。同时还以某一实际工程的整体式桥台桥梁为研究对象,采用IABS程序对可能影响桩基等代桩长和台后土压力合力的各种结构因素进行分析,得出若干有益于该类桥梁设计的结论。 The three-dimensional framework simplified model of the integral abutment bridges is put forward. By means of ANSYS secondary development, a special analysis program IABS for length of the equivalent cantilever pile and earth pressure acting on abutment is established on the basis of simplified model. Combined with national bridge existing design software IABS, integral abutment bridges can be designed directly and foundation for the application of this type bridges in China is made. Furthermore,taking a practical integral abutment bridge as an research subject, several kinds of structural factors which may influence on the length of the equivalent cantilever pile and earth pressure acting on abutment are analysed using IABS. From the above, some benefit results for such bridges design are achieved.
出处 《公路》 北大核心 2009年第2期34-40,共7页 Highway
基金 上海市教委重点项目(040A01) 上海市自然科学基金项目(05ZR14113) 福建省科技厅重点项目(2006H0021)
关键词 桥梁工程 整体式桥台桥梁 简化计算模型 等代桩长 台后土压力 bridge engineering integral abutment bridges simplified calculating model length of equivalent cantilever pile earth pressure acting on abutment
  • 相关文献

参考文献11

  • 1Susan Faraji, John M Ting, Daniel S Crovo, Helmut Ernst. Nonlinear Analysis of Integral Bridges: FiniteElement Model[J]. Journal of Geotechnical and Geoenviormental Engineering. 2001,127(5).
  • 2林志平,彭大文.整体式桥台桥梁设计与实践的发展现状[J].世界桥梁,2005,33(4):13-17. 被引量:7
  • 3彭大文,林志平,洪锦祥.无伸缩缝桥梁的研究与实践[J].公路,2006,51(8):53-62. 被引量:34
  • 4Burke M P Jr. The Design of Integral Concrete Bridges [J]. Concrete International, 1993,15(6).
  • 5I Husain, D Bagnariol. Integral abutment bridges[R]. Rep. SO- 96 - 01, Ontario Ministry of Transportation, St. Catharines, Ont. , Canada, 1996.
  • 6Susan Faraji. Behavior of Integral Abutment Bridges in Massachusetts - Year I[R]. Report to the Massachusetts Highway Department, University of Massachusetts Transportation Center. University of Massachusetts, Amherst, Massachusetts. 1996.
  • 7洪锦祥,彭大文.桩基础的整体式桥台桥梁受力性能研究[J].中国公路学报,2002,15(4):43-48. 被引量:29
  • 8R M Barker, J M K Duncan, K B Rojiani, P S K Ooi, S G Kim. Manuals for the design of bridge foundation [R]. NCHRP Rep. 343, Transportation Research Board, National Research Council, Washington D. C. , Dee. 1991.
  • 9American Petroleum Institute (API). Recommended practice for planning, designing, and constructing fixed offshore platforms-Working stress design[C]. 20th Ed. , API RP2A-WSD, Washington, D.C. , 1993.
  • 10洪锦祥,彭大文,汪新惠.整体式桥台桥梁的台后被动土压力研究[J].福州大学学报(自然科学版),2003,31(6):721-725. 被引量:16

二级参考文献64

  • 1彭大文,陈朝慰,洪锦祥.整体式桥台桥梁的桥台结点受力性能研究[J].中国公路学报,2005,18(1):46-50. 被引量:17
  • 2彭大文,洪锦祥,郭爱民,方德铭.无伸缩缝桥梁的动力特性计算与试验研究[J].地震工程与工程振动,2005,25(2):72-76. 被引量:13
  • 3李扬海 程潮洋 等.公路桥梁伸缩装置[M].北京:人民交通出版社,1997.64-67.
  • 4洪锦祥.桩土共同作用对整体式桥台的无绅缩装置桥梁受力性能影响的研究[M].福州:福州大学,2001..
  • 5洪锦祥.[D].福州:福州大学,2001:12.
  • 6[1]JTJ 021-89,公路桥涵设计通用规范[S].
  • 7[5]SPYRAKOS C, LOANNIDIS. Seismic behavior of a post-tensioned integral bridge including soil-structure interaction (SSI)[J]. Soil Dynamic and Earthquake Engineering, 2003,23 ( 1 ): 53-63.
  • 8[6]MYLONAKIS G, PAPASTAMATION D, PSYCHARIS J, MAHMOUD K. Simplified modelling of bridge response on soft soil to nonuniform seismic excitation[J].Journal of Bridge Engineering, ASCE, 2001,6 (6): 587-597.
  • 9[8]BARKER R M,DUNCAN J M,ROJIANI K B,et al.Manuals for the design of bridge foundations[A]. National Hooperative Highway Research Program (NCHRP) [C]. Washington D C: Transportation Research Board, 1991.
  • 10[1]M Arockiasamy,Narongrit Butrieng,M Sivakumar.State-of-the-Art of Integral Abutment Bridges:Design and Practice[J].Journal of Bridge Engineering,2004,9(5):497-506.

共引文献81

同被引文献16

引证文献3

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部