期刊文献+

横向拱塔斜拉桥的拱轴线逐段设计算法研究 被引量:10

AN INCREMENTAL DESIGN ALGORITHM OF ARCH AXIS OF ARCH-SHAPED TOWER FOR CABLE-STAYED BRIDGE
原文传递
导出
摘要 拱塔斜拉桥的拱轴线设计是一项复杂工作,该文提出了拱形主塔拱轴线的逐段设计算法。该算法将拱轴线离散为一系列连续直线段,根据设计指定的主拱内力状态和节段的平衡条件,自拱顶起逐点计算出拱轴线坐标。另外该算法仅要求已知斜拉索竖向索力分量,其余两个索力分量可在逐段计算拱轴线坐标的同时得到。该文以主梁弯曲应变能为目标函数对索力的竖向分量进行了研究。台江大桥主塔拱轴线算例研究表明,逐段拱轴线设计算法具有较高的精度和计算效率。 The design of arch axis is a difficult task for cable-stayed bridge with arch-shaped tower. Assuming a polyline for the arch axis, an incremental algorithm is presented for the geometrical analysis of arch-shaped tower. The nodal coordinates of the arch are computed incrementally according to the targeted distribution of bending moments and central thrust force. Only vertical components of cable forces are required by this algorithm, and the total cable forces can be determined during the shape analysis of arch axis. Optimization technique is employed for the determination of vertical components of cable forces. The validty and effectiveness of the proposed arlorithm are illustrated with a case study of a cable-stayed bridge with arch-shaped tower.
出处 《工程力学》 EI CSCD 北大核心 2009年第2期131-136,共6页 Engineering Mechanics
关键词 斜拉桥 拱轴线 逐段算法 指定状态法 优化分析 合理设计 cable-stayed bridge arch axis incremental algorithm specified state optimization resonable design
  • 相关文献

参考文献11

  • 1Yasumitsu W. Miho museum bridge, Shigaraki, Japan [J]. Structural Engineering International, 2002, 12(4): 245-247.
  • 2Sung Y C, Chang D W, Teo E H. Optimum post-tensioning cable forces of Mau-Lo Hsi cable-stayed bridge [J]. Engineering Structures, 2006, 28(10): 1407-1417.
  • 3顾懋清,石绍甫.公路桥涵设计手册-拱桥(上册)[M].北京:人民交通出版社,1997.
  • 4裘伯永,王艺民.拱轴线最优选择[J].长沙铁道学院学报,1991,9(3):140-148. 被引量:6
  • 5林阳子,黄侨,任远.拱桥拱轴线的优化与选形[J].公路交通科技,2007,24(3):59-63. 被引量:23
  • 6刘毓湘,高敬红.基于4次样条函数拱轴线优化设计的T-V求解法[J].公路交通科技,2007,24(6):80-85. 被引量:12
  • 7Steven C Chapra. Numerical methods for engineers [M]. New York: McGraw-hill, 1998.
  • 8Lazar B E, Troitsky M S, Douglass M M. Load balancing analysis of cable stayed bridges [J]. Journal of the Engineering Mechanics Division, 1972, 98: 1725-1740.
  • 9Wang P H, Tseng T C, Yang C G Initial shape of cable-stayed bridges [J]. Computer & Structures, 1993, 47(1): 111-123.
  • 10张建民,肖汝诚.斜拉桥合理成桥状态确定的一阶分析法[J].力学季刊,2004,25(2):297-303. 被引量:19

二级参考文献24

共引文献50

同被引文献93

引证文献10

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部