期刊文献+

成组加工生产周期的矩阵算法 被引量:1

Matrix Algorithm of Group Machine Production Cycle
原文传递
导出
摘要 用计算生产周期的方法计算当一组零件在一系列设备上加工顺序确定下来后的加工周期比较繁杂,本文给出一种简便算法,可以显著地减少计算时间。 It is a common object of production management that production cycle must be calculated after processing orders of a group of parts on machines are determined. Although classical methods of calculating production cycle are effective but they are complex. In this paper, a new method that saves time is presented.
出处 《吉林工业大学学报》 CSCD 1990年第2期103-107,共5页
  • 相关文献

同被引文献19

  • 1李海婴.多品种流水型生产条件下加工周期的计算[J].武汉工学院学报,1989,11(2):55-65. 被引量:4
  • 2何桢,齐二石,杨永德.一般作业车间零件排序方法研究[J].系统工程理论与实践,1996,16(12):11-16. 被引量:9
  • 3张应元,刘贤鹏.平行顺序生产的组合计算[J].华东化工学院学报,1987,13(2):183-191.
  • 4Lockyer K G. Production management[M]. London: Pitman Books Limited, 1983.
  • 5Rao S S. The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis[J]. International Journal of Production Economics, 1992(2): 221-227.
  • 6Truscott W G. Scheduling production activities in multi-stage batch manufacturing systems[J]. International Journal of Production Research, 1985, 23(2): 315-328.
  • 7Truscott W G. Production scheduling with capacity-constrained transportation activities[J]. Journal of Opera- tions Management, 1986, 6(3): 333-348.
  • 8Kropp D H, Smunt T L. Optimal and heuristic models for lot splitting in a flow shop[J]. Decision Sciences, 1990, 21(4): 691-709.
  • 9Steiner G, Truscott W C. Batch scheduling to minimize cycle time, flow time, and processing cost[J]. IIE transactions, 1993, 25(5): 90-97.
  • 10Kalir A A, Sarin S C. Optimal solutions for the single batch, flow shop, lot streaming problem with equal sublots[J]. Decision Sciences, 2001, 32(2): 387-398.

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部