期刊文献+

候凝过程中脉冲振动水泥浆防止环空气窜机理 被引量:3

Anti-channeling with Pulse Vibration during WOC.
在线阅读 下载PDF
导出
摘要 水泥浆静胶凝强度发展会造成水泥浆失重,当环空静压力和气体在环空中的流动阻力之和小于气层压力时,就会形成环空气窜的缺陷,这是发生环空气窜的主要原因。对环空中候凝水泥浆实施低压低频脉冲振动可以从3个方面防止环空气窜:①在水泥浆由液态向固态转化的过程中,脉冲振动使水泥浆保持低速运动状态,可以大幅度减小由于水泥浆静胶凝强度发展引起的水泥浆失重,有效防止环空气窜的发生;②脉冲振动可以促进水泥的早期水化,提高水泥浆早期抗窜能力;③脉冲振动可以提高水泥浆与2个界面的胶结质量,改善水泥石微观结构,使水泥石更加密实,防止气层气体通过水泥环界面和水泥石基体内部气窜。从环空气窜机理入手,分析了水泥浆水化过程中静胶凝强度发展特征,并阐述了候凝过程中脉冲振动水泥浆防止环空气窜的机理。 The development of the gel strength of cement slurry may result in the weight loss of the cement slurry.When the sum of the annular hydrostatic pressure and the annular flow friction is less than the(gas-bearing) formation pressure,annular gas channeling occurs.Application of low-volt low-frequency pulse vibration kills gas channeling in three ways: 1) cement slurry is kept in motion by the pulse vibration during its solidification;2) the early strengthening of cement slurry is accelerated by the pulse vibration,thus increasing the anti-channeling capacity of cement slurry in the early solidification period;and 3) pulse vibration improves the bonding quality of the two interfaces of cement sheaths and the micro structure of the set cement,making the whole set cement more competent and dense.
出处 《钻井液与完井液》 CAS 2009年第1期38-41,共4页 Drilling Fluid & Completion Fluid
基金 国家863课题"高温高压高含硫气井新型防气窜防腐水泥浆体系研究"(2006AA06Z209)资助
关键词 固井质量 环空气窜 静胶凝强度 失重 水泥浆 脉冲振动 Cementing job quality Annular gas channeling Gel strength Weight loss Cement slurry Pulse vibration
  • 相关文献

参考文献9

二级参考文献16

  • 1李玉海,赵立新,王军荣.振动固井技术综述[J].石油钻采工艺,1994,16(6):40-42. 被引量:22
  • 2钟水清,熊继有,张元泽,孟英峰,吴康,李福德,冯万奎,钟克修,谭蓉蓉.我国21世纪非常规能源的战略研究[J].钻采工艺,2005,28(5):93-98. 被引量:50
  • 3郭小阳,刘崇建,谢应权,许树谦,王军,苏洪生.大斜度及水平井中水泥浆的失重和气侵研究[J].西南石油学院学报,1996,18(2):25-34. 被引量:12
  • 4孙展利.水泥浆的沉降失重研究[J].石油钻采工艺,1997,19(2):31-36. 被引量:17
  • 5孙展利.水泥浆的沉降—胶凝失重研究[J].西南石油学院学报,1997,.
  • 6Newman E,Wojtanowicz AK,Gahan BC.Cement pulsation improves gas well cementing.World Oil,2001(7):40-45
  • 7Chimmalgi VS,Wojtanowicz AK.Cement pulsation-a proven and cost efficient technology for improving primary cementing and safe wells.6th India Oil and Natural Gas Corporation Limited International Petroleum Conference,New Delhi,2005.India Oil & Natural Gas Corporation,2005,1-15
  • 8Doherty D,Smalley E,Aslakson J.Preventing annular flow after cementing,in the shallow gulf of Mexico.Gastips,2004,10(4):27-30
  • 9Haberman J P.Method apparatus to improve the displacement of drilling fluid by cement slurries during primary and remedial cementing operations and to improve cement bond logs and to reduce or eliminate gas migration problems.US Patent 5377753,1995
  • 10Haberman J P. Method apparatus to improve the displacement of drilling fluid by cement slurries during primary and remedial cementing operations and to improve cement bond logs and to reduce or eliminate gas migration problems[ P]. US Patent 5377753,1995.

共引文献37

同被引文献58

  • 1刘德平,付华才,吴林龙,何仕宝.川东深井固井技术[J].钻采工艺,2005,28(1):16-17. 被引量:14
  • 2李玉海,赵立新,王军荣.振动固井技术综述[J].石油钻采工艺,1994,16(6):40-42. 被引量:22
  • 3熊健.浅谈环空窜流的问题[J].内蒙古石油化工,2010,36(21):91-93. 被引量:6
  • 4巢贵业,陈宇.固井环空气窜机理和防窜水泥浆体系及其措施[J].水泥工程,2006(4):79-81. 被引量:36
  • 5张宏军.深井固井工艺技术研究与应用[J].石油钻探技术,2006,34(5):44-48. 被引量:38
  • 6齐奉忠,刘硕琼,袁进平.气井环空带压的原因分析及解决措施浅析[C]//《第八届石油钻井院所长会议论文集》编委会.第八届石油钻井院所长会议论文集.北京:石油工业出版社,2009:358-363.
  • 7J. P. Haberman, S. L. Wolhart. Reciprocating cement slurriesafter placement by applying pressure pulse in the annulus[R]. SPE 37619, 1997.
  • 8S. Talabani, G. Hareland, M. R. Islam. Gas Migration Eliminat- ed Through Correct Cement Design Including Elastomers[R]. SPE 39279, 1997.
  • 9Thomas C. Morris, M. Zuki Bidi, Youssef Elmarsafawi, et al. In- novative remedial cementing solution provides annular isola- tion in Duyong B-4[R]. SPE 88017, 2006.
  • 10H. Bouras, Sonatrach, E. Toukam, et al. Successful applica- tion of novel cementing technology in Hassi-Messaoud, Alge- ria[R]. SPE 108249, 2007.

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部