期刊文献+

以发展的眼光开发西部水电资源 被引量:2

Explore Water Resources in the West China Based on Developing Perspective of View
在线阅读 下载PDF
导出
摘要 我国是一个发展中国家,水电资源相对丰富,而丰富的水电资源主要集中在西部地区,以发展的眼光视角,研究和分析了西部水电开发的战略意义及其所面临的问题,指出西部水电开发必须坚持可持续发展的道路,兼顾人与自然、人与社会及人与环境的和谐发展。 China is a developing country which has relatively abundant water energy resources, mainly concentrating in the west of China. In this paper, the strategic significance of water energy resources exploitation in west China and the problems faced were researched and analyzed with a development perspective of view, pointed out that the exploitation of water energy resources in west China must adhere to the path of sustainable development, keeping harmony among people, society, nature, and environment.
作者 刘蔚
出处 《电网与清洁能源》 2009年第1期48-51,共4页 Power System and Clean Energy
关键词 水电资源 西部水电开发 可持续发展 生态环境 water energy resources water energy resourcesexploitation in west China sustainable development ecoenvironment
  • 相关文献

参考文献3

二级参考文献5

共引文献37

同被引文献31

  • 1南海鹏,王涛,余向阳.基于PCC的高可靠性模糊PID励磁调节器[J].水力发电学报,2004,23(6):29-34. 被引量:14
  • 2李维新,南海鹏.PCC双通道励磁调节器的研究与开发[J].西北水力发电,2005,21(1):8-11. 被引量:2
  • 3Rodrigues R N,Finardi E C,da Silva E L.Optimal Dispatch of Hydro Generation Plants Via Augmented Lagrangian[C]// Power Engineering Society General Meeting.2005(3):2732-2737.
  • 4Antoniol,Jose Manuel,Francisco Apolinar Villamor.Self-scheduling of a Hydro Producer in a Pool-based Electricity Market[J].IEEE Transcations on Power System,2002,17(4):1265-1271.
  • 5Lakshminarasimman L,Subramanian S.Short-term Scheduling of Hydrothermal Power System with Cascaded Reservoirs by Using Modified Differential Evolution[J].IEEProc.-Gener.Transm.Distrib,2006,153(6):693-700.
  • 6Lei Wu,Zuyi Li.GENCO's Risk-constrained Hydrothermal Scheduling[J].IEEE Transactions on Power Systems,2008,23(4):1847-1858.
  • 7Verbic G,Caizares C A.Probabilistic Optimal Power Flow in Electricity Markets Based on A Two-point Estimate Method[J].IEEE Trans on Power Systems,2006,21(4):1883-1893.
  • 8Li T,Shahidehpour M,Li Z.Risk-Constrained Bidding Strategy with Stochastic Unit Commitment[J].IEEE Transactions.Power Systems,2007,22(1):449-458.
  • 9Jabr R A.Robust Self-schduling Under Price Uncertainty Using Conditional Value-at-risk[J].IEEE Transactions on Power Systems,2005,20(3):1852-1858.
  • 10Wu L,Shahidehpour M,Li T.Cost of Reliability Based on Stochastic Unit Commitment[J].IEEE Transac-tions.Power Systems,2008,23(3):1364-1374.

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部