摘要
广州珠江黄埔大桥南引桥施工采用MSS45 m下行式移动模架,采用整体横移技术,该技术具有施工周期短、对模架损伤小、施工安全可靠、经济性好等优点。简要论述该MSS45 m移动模架整体横移换幅关键技术。
The MSS45 m under-deck movable shuttering form was used for construction of the south approach bridge of Huangpu Bridge over Zhujiang River in Guangzhou and the working positions of the form were changed by the integrally laterally shifting technique. The technique has the advantages of short construction period, little damage to the form, safe and reliable construction and good economic benefit. In this paper, the key techniques for changing the working positions of the moveable shuttering form by integrally laterally shifting are described in brief.
出处
《桥梁建设》
EI
CSCD
北大核心
2008年第6期57-59,72,共4页
Bridge Construction
基金
广东省交通科技项目(2006-02)
关键词
移动模架
箱形梁
桥梁施工
movable shuttering form
box girder
bridge construction