摘要
用统计数学的方法处理实验数据,获得了堆浸提金法的最佳浸出时间.用图解的方法展示了堆浸提金法的经济分析.本文讨论了影响堆浸提金过程中最大盈利的几个重要因素.
In this paper, the optimun leach time for heap leaching of gold ore is determined through the treatment of experimental data by way of statistical mathematics. In addition, an economic analysis for the heap leaching is shown by graphic method and a few important factors which influence economic benefit terribly in the course of heap leaching operation are discussed in this paper
出处
《黄金》
CAS
北大核心
1990年第8期33-37,共5页
Gold