摘要
古叙电网与泸州主网联系薄弱的问题由来已久,着重阐述如何加强古叙地区电网建设,特别是古叙220kV电网的规划建设,以及如何与泸州主网紧密、安全连接,切实提高该地区电网供电可靠性。
The weak - connection between Gulin - Xuyong and Luzhou power grid has been a long - existing problem. In this paper, the measures to strengthen the construction of Gulin - Xuyong power grid are proposed. These measures include the construction plan of Gulin - Xuyong 220kV power grid, establishing close and secure connection to the main power grid of Luzhou, and improvement of power supply reliability.
出处
《四川电力技术》
2008年第B11期36-39,共4页
Sichuan Electric Power Technology
关键词
古叙电网建设
220
KV电网
可靠性
稳定性
construction of Gulin - Xuyong power grid
220kV power grid
reliability
stability.