摘要
钱塘江为浙江省及长江三角洲地区规划重点建设的骨干航道,但富春江航电枢纽船闸的航运"瓶颈"制约现象日益突出。文章对解决该通航瓶颈问题的若干改造方案进行分析探讨,并提出建议实施方案,以满足长远发展的要求。
The Qiantangjiang River is the key waterway of the major project planned to be constructed in Zhejiang Province and the Yangtze River Delta area. But the restrictive effect of the shipping bottleneck at the Fuchunjiang River navigation junction's lock becomes more and more obvious. Several processing programs for this problem are analyzed and the implementation scheme is proposed to satisfy the requirement of long-term development.
出处
《水运工程》
北大核心
2008年第11期136-138,147,共4页
Port & Waterway Engineering
关键词
电站枢纽
通航瓶颈
方案
探讨
power station junction
shipping bottleneck
scheme
discussion